Gates, Stop Logs, Trashracks, Embedded Parts

REEL COH specializes in the design, fabrication and installation of Gates, Stop Logs, Trash Racks & Embedded Parts.

Typically gates, stop logs, trash racks & embedded parts are used in the flow of water going through the intake or spillway sluices.

Reliable and efficient Gates, Stop logs, Trash Racks & Embedded Parts

Gates or stop logs have the same purpose which is to close the flow of water. Stop logs are typically smaller than gates ; stop logs are used where the operation is occasional and not repetitive, when spilling is required from the top rather than from the bottom and when opening or closing is not required in an emergency situation.

Gates offer a much faster operation especially if they are permanently tied to a hoisting mechanism. In modern hydropower constructions, stop logs are mostly used for isolating the installed gates for maintenance purposes.

Trash racks are used upstream of the whole process to restrain foreign objects in the flow of water.

Embedded parts are the parts provided to guide the stop logs, trash racks or gates when lifting or lowering. Embedded parts include anchors provided for installation prior to the original pouring of concrete and guides, seals and lintels which are installed further to the concrete original pour and following their installation cast in place in a secondary concrete pour.

 

Some news of Iter project progress

Assembly Hall One giant standing

REEL participate to the development of the LCA60T project,

REEL will provide the 12 winches that will equip the airship and will lift or drop 60 tons of cargo

Hydro’s Karmoy technology pilot in full operation

We are proud that NKM Noell Special Cranes could participate to this challenge

REEL COH Sept-Îles wins Award of Excellence

in the Customer Service category for its work at Aluminerie Alouette.

Join a dynamic group! Reel hires all over the world