Gantries and Monorails

REEL COH is specialized in the design, engineering, manufacturing, installation and start-up of lifting equipment for hydropower projects such as Gantries and Monorails for Spillway and Intake Gate Maintenance, Stop Logs.

Gantries and Monorails for Maintenance Stop Logs are used for the handling of stop logs serving for protection against water flow upstream of  spillway and intake gates for inspection and maintenance. They can also be used for the same purpose at the draft tube.

Stop log gantries or monorails are provided with a lifting beam and service a whole series of sluices. The lifting beam allows the picking and releasing of the stop logs when submerged in water. The opening and releasing of the hooks provided on the stop log lifting beam can be manually operated or motorized.

Reliable and efficient Gantries and Monorails for Spillway and Intake Gates maintenance Stop logs.

Since they serve the critical intake and spillway gates, the gantries or monorails for maintenance stop logs should be designed to handle the extreme load conditions generated by motor stall torque in case of dynamic asymmetrical jamming of the stop log in the embedded guides during lifting.

 

REEL USA will take part in the PNAA’s 18th Annual Aerospace Conference

Come and meet with our experts at REEL’s booth #18 to see our latest innovations in automated production lines,

Greetings 2019

We wish you a very Happy and Successful Year ahead !

Some news of Iter project progress

Assembly Hall One giant standing

REEL participate to the development of the LCA60T project,

REEL will provide the 12 winches that will equip the airship and will lift or drop 60 tons of cargo

Join a dynamic group! Reel hires all over the world