REEL COH supplier of the powerhouse crane and the gantry crane to the John Hart project

REEL COH is proud contributing to the success of the John Hart project by supplying  to SNC-LAVALIN the powerhouse crane and the tailrace gantry crane.

 

Some information on SNC Lavalin website

In early 2014, BC Hydro awarded SNC-Lavalin a contract to design, build, finance, and maintain the John Hart Generating Station Replacement Project on Vancouver Island in British Columbia, Canada. As part of the deal, BC Hydro provided 60 percent of the approximately $700 million construction capital cost, with SNC-Lavalin Capital Inc. providing the balance through invested equity and arranged debt financing.

The project made history as Canada’s first P3 project in the hydropower sector, and creates a more reliable, safer and environmentally friendly generating station with an installed capacity of 138 MW.

 

Learn more here /https://www.youtube.com/watch?v=ty9SuH0eD-M

Join a dynamic group!
Reel hires all over the world

Back to one of ITER 2020′ s great achievement : Cryostat lower cylinder, another major assembly achievement

Jan, 21 2021, Congratulations , for this amazing and great achievement to all ITER teams !!!

REEL wishes you a Happy New Year 2021 !

We wish you a happy new year 2021

REEL announces the acquisition of FLSmidth Hamburg GmbH specialized in materials handling .

REEL announces the acquisition of FLSmidth Hamburg GmbH specialized in materials handling

REEL International signed an agreement to acquire Metso Outotec’s Aluminium business.

28th December REEL International has signed today the acquisition of Metso Outotec Oyj (Finland) aluminium business.