Full assembled Furnace Tending Assembly delivered successfully

Our NKM Noell Special  Cranes team, delivered successfully the fully assembled Furnace Tending Assembly to Hamburg.

The Furnace Tending Assembly– FTA- was pre-cabled and tested in our workshop of La Rochelle in France.

One more example of our flexibility with this compact assembly.

The pictures show  the trolley loaded on SPMT and the trolley loaded on the crane bridge.

Join a dynamic group!
Reel hires all over the world

1959 : REEL’s “Jumbo” dig the Mont-Blanc tunnel

50 years ago  : 1959 - The « Jumbo » of REEL dig the Mont-Blanc tunnel.

REEL : Airbus honours its top-performing suppliers

REEL honored to receive the Airbus Performance & Quality Award in toolings Procurement at the Airbus Global Supplier

50-year anniversary of Airbus : REEL partner of the industrial performance

REEL has been working on several projects with Airbus and is proud to have successfully completed key projects.

ITER : Load tests Heavyweight champion

The REEL-NKM Noell single boom crane offer the highest capabilities at a lower cost.