Full assembled Furnace Tending Assembly delivered successfully

Our NKM Noell Special  Cranes team, delivered successfully the fully assembled Furnace Tending Assembly to Hamburg.

The Furnace Tending Assembly– FTA- was pre-cabled and tested in our workshop of La Rochelle in France.

One more example of our flexibility with this compact assembly.

The pictures show  the trolley loaded on SPMT and the trolley loaded on the crane bridge.

Join a dynamic group!
we are always on the lookout for new talents!
Reel hires all over the world

ITER : TOKAMAK ASSEMBLY | The big lift featuring REEL!

The first section of the plasma chamber was lifted and transferred from the assembly tool to the pit by REEL cranes.

ITER : TOKAMAK ASSEMBLY | The big lift featuring REEL!

The first section of the plasma chamber was lifted and transferred from the assembly tool to the pit by REEL cranes.

Some news from ITER to start 2022 !

ITER's latest achievements : ITER launched the tests of the radial beam installation.

REEL and its teams wish you a Happy New Year !

REEL and its teams wish you a Happy New Year 2022!